Sheridan ConcreteSheridan Concrete

Concrete sidewalk building in Sheridan WY - a walk built to handle freeze and thaw

Cracked, heaved or flaking walk, or none at all where you need one? We build a new walk that sheds water and handles winter.

Concrete patio and walkway with expansion joints and shallow steps extend along a white-sided house.
  • Licensed and insured.
  • Free quotes on site.
  • We respond within 1 business day.

What goes into building a new concrete sidewalk in Sheridan?

Concrete sidewalk building in Sheridan, WY means digging out and packing a solid base, forming and pouring a new slab, finishing the top and letting it cure, so you end up with a walk that drains and holds up to freezing and thawing.

Most calls start with a walk that's cracked, tipped up at a joint or flaking on top, or a path to the door that's just mud and stepping stones. At Sheridan Concrete we build walks in Sheridan and the cities around it, and the price mostly comes down to length and width, how much old concrete we break out and haul away, how much digging the base needs and whether the walk ties into concrete steps or a curve. The schedule turns on the weather more than anything, because I won't pour into a freeze and the new slab needs its curing time before you lean on it. The written estimate lays out the choices that move your number.

How we handle concrete sidewalk building

We start by checking where the water runs, because a walk that falls toward the house sends melt and rain right at your foundation. Then we break out any old concrete, dig down to firm ground and pack the subgrade, the soil and gravel the slab sits on, instead of raking it level and hoping. We set forms with enough slope that water runs off, choose the mix and the pour date with freezing in mind, and pour early in the day so the top doesn't bake into a weak, dusty surface. A broom finish, the light texture on most walks, gives your feet some grip, and we cut control joints, shallow grooves that give the slab a chosen place to crack, before it picks one on its own. Then we let it cure, the stretch where concrete gains its strength, before it sees much use, and we tell you how to handle ice that first winter. If the budget gets tight, I'd keep the money in the base and go plainer on the top, because nobody sees the base on day one and everybody sees it when a walk settles.

A walk usually ties into something else, and if it runs up to a garage with a worn-out slab inside, we can handle the garage floor concrete too. If plain gray doesn't suit the front of the house, decorative concrete adds color, borders or a pattern, and I'll tell you straight which finishes stay grippy underfoot.

  • Replacing a cracked or heaved walk

    This suits a walk that's tipped, broken or flaking past the point of patching. We break out the old slab and fix what's under it, because the base usually explains why the old one failed.

  • A new walk where there wasn't one

    This suits a worn dirt path, stepping stones or a new link from the driveway to the door. We start from bare ground, so the slope and the base are right from the first shovel.

Concrete sidewalk building in Sheridan, and what changes the job here

Before any work starts, we check with the City of Sheridan Building Division on whether your walk needs a permit, and if it does, we take care of getting it so you aren't left guessing.

Most of the walks we're called to around Sheridan have the same few problems. One section has heaved up at a joint and catches a toe, the walk has settled so it pitches back toward the house, or the top has flaked off in patches where water sat and froze. When we break those out, we usually find a thin, loose base and no real plan for where the water goes. So that's where we spend our time on every walk, digging to firm ground and setting the slope before we think about the finish.

Why Sheridan homeowners call Sheridan Concrete for a new walk

  • I look at every walk myself

    I come out to look at every job, and I'm on site with our crew when the work gets done. The person who priced your walk is the one watching the base go in.

  • Licensed and insured for your job

    Sheridan Concrete is licensed and insured. The city offers a contractor licensing information packet on its contractor page, and it's worth reading while you compare who builds your walk.

  • Started on Sheridan concrete crews

    I spent my summers through school on concrete crews around Sheridan, from the shovel up to finishing, and started this business in 2023. I've done the digging myself, so I know what a skipped base turns into.

Call (307) 218-3106 or reach us through the contact page to set up a time for me to come look at your walk.

Request a quote

Get a written estimate for your new sidewalk

We respond within one business day to every call and form. Estimates are free and done on site, with no pressure to book. Once you send this, we'll set a time for me to come out, look at the walk, ask how you use it and go over the choices before you get your written estimate.

What happens after you ask about a new walk?

  1. Call or send the form

    Tell us where the walk goes and what's there now, and we'll set a time for me to come out. A rough length and width helps me come prepared.

  2. I walk the site with you

    I look at the ground, where the water runs and any old concrete to break out, and ask how you'll use the walk. After we talk through the choices that move the price, like size, tear-out and finish, you get a written estimate.

  3. We prep, pour and finish

    Our crew digs out and packs the base, sets forms, pours and finishes with me on site, on a date picked with freezing in mind. The new slab then gets its curing time before it sees much use.

  4. We walk the finished job

    Once it's done, we walk the new sidewalk with you and go over care for the first season. That includes how to handle ice that first winter.

Frequently asked questions

How much does a new concrete sidewalk cost in Sheridan, WY?

Installing a concrete sidewalk across the US usually costs about $12 to $14.50 per square foot. That's a national figure for the work, not a Sheridan quote or our price. Your own walk's cost moves with its size, any old concrete to remove and how much base work the ground needs, and the written estimate gives you that number.

When is the best time of year to pour a concrete sidewalk?

Pour when the fresh concrete will stay clear of freezing temperatures for a good stretch. One trade group urges caution with late fall, winter and early spring pours, when a walk can freeze while it's still saturated. If the forecast doesn't give us that window, I'll tell you to wait.

How long does new concrete need to cure before I use the sidewalk?

An Ohio concrete trade group says to start curing right after finishing and keep it going for at least 7 days, longer when the weather is cooler. Curing keeps the slab from drying out too fast so it can gain strength, usually with a liquid curing compound or wet burlap under plastic, so build those days into your plans and add a few for a cool-season job.

How do I handle ice on a new concrete sidewalk the first winter?

Skip deicing salts for the first year, especially if the walk went in after September, and use sand or kitty litter for traction instead. One trade group also warns that ammonium sulfate, ammonium nitrate and magnesium-based salts eat into concrete surfaces, so keep those off the walk for good.

What is the best concrete mix for a sidewalk that freezes and thaws?

For concrete that sees hard freezing and thawing, one trade group says to order good-quality air-entrained concrete, a mix with tiny air bubbles worked into it. That mix helps the walk resist scaling, the flaking and peeling you see on older walks, so it's fair to ask any contractor which mix they'll order.

How do I keep a concrete sidewalk from flaking?

Keep water from sitting on it, keep harsh deicers off it and seal it now and then. Saturated concrete that freezes and thaws is prone to flaking, and overworking the surface during finishing knocks out the air that protects it, which is why a plain broom finish is usually enough outdoors. An Ohio trade group suggests cleaning the walk and reapplying a commercial penetrating sealer every 3 to 5 years, following the sealer maker's instructions.

  • Garage floor concrete

    If your new walk runs up to the garage and the floor inside is cracked, pitted or sinking, doing that slab while we're set up can save a second round of prep.

  • Decorative concrete

    When a plain gray walk doesn't suit the front of the house, color, borders or a pattern can dress it up, and we'll talk through which finishes stay grippy underfoot.

Sheridan, WY

Get a price on your new walk

Have the walk's rough length and width and the season you hope to build in ready when you call (307) 218-3106, and we can start planning the pour date from the first conversation.

(307) 218-3106Request a quote